§ 8-35. Mechanical fees.  


Latest version.
  • The following permit fees are imposed and assessed and shall be paid at the time of the making of an application for a permit for the work or service, installation, or construction hereinafter described:

    (1)

    For issuing each permit ..... $ 35.00

    (2)

    Air conditioning and refrigeration (total capacity in single installation), each dwelling, apartment or business being considered a separate system, for each ton of capacity of fractional part thereof:

    a.

    For one (1) to ten (10) tons (per ton) ..... 11.00

    b.

    For each ton over ten (10) tons or fractional part thereof up to twenty-five (25) tons (per ton) ..... 6.60

    c.

    For each ton over twenty-five (25) tons or fractional part thereof (per ton) ..... 5.50

    (3)

    Furnaces and heating equipment (total capacity in single installation) for each dwelling, apartment or business:

    a.

    For the first two hundred thousand (200,000) BTU an hour capacity or fractional part thereof ..... 22.00

    b.

    For each additional fifty thousand (50,000) BTU an hour input or thereof ..... 11.00

    c.

    Burner (not in heating system), each ..... 8.80

    (4)

    Air duct systems:

    a.

    For the first two thousand (2,000) cubic feet a minute capacity of air handled in duct system ..... 16.50

    b.

    For each one thousand (1,000) cubic feet a minute over two thousand (2,000) cubic feet or fractional part thereof up to ten thousand (10,000) cubic feet a minute ..... 6.60

    c.

    For each additional 1,000 cubic feet a minute or fraction thereof ..... 4.40

    (5)

    Commercial hoods and fans ..... 38.50

    (6)

    Boilers, including heating elements: for the first five hundred thousand (500,000) BTU per hour ..... 33.00

    For each additional one hundred thousand (100,000) BTU per hour input or fractional part thereof ..... 11.00

    (7)

    Fireplace each ..... 33.00

    (8)

    Alterations or repairs on boilers or on pressure fire vessels ..... 33.00

    (9)

    Tanks, all types, gasoline or LP:

    a.

    Zero (0) to six hundred (600) gallons ..... 15.40

    b.

    Over six hundred (600) to one thousand (1,000) gallons capacity ..... 22.00

    c.

    For each additional one thousand (1,000) gallons or fractional part thereof ..... 3.30

    (10)

    Service station automobile lifts ..... 16.50

    (11)

    Elevators, escalators, and man lifts:

    a.

    Hoist for the first four (4) floors ..... 22.00

    (12)

    Solar A/C collector system ..... 22.00

    (13)

    For mechanical permits not listed above, the fee shall be based on seven dollars ($7.00) per one thousand dollars ($1,000.00) of the cost of project.

    (14)

    Minimum fee for a mechanical permit ..... 41.00

    Inspection: For additional inspections or reinspections, there will be a thirty-five dollar ($35.00) charge in addition to the fees listed above.

(Ord. No. 2003-12, § 1, 11-20-03; Ord. No. 2006-17, § 2, 9-25-06; Ord. No. 2017-18 , § 1, 7-5-17)