Neptune Beach |
Code of Ordinances |
Part II. CODE OF ORDINANCES |
Chapter 8. BUILDINGS AND BUILDING REGULATIONS |
Article II. BUILDING CODE |
§ 8-31. Electrical fees.
The following permit fees hereby are imposed and are assessed and shall be paid at the time of the making of an application for a permit for the work or service, installation or construction hereinafter described:
(1)
General fees:
Issuing of permit ..... $35.00
Temporary service construction pole ..... 22.00
Air condition circuits:
40 to 100 amps ..... 27.50
Under 40 amps, including window units, minimum ..... 16.50
New family dwelling:
Not exceeding 100 amp service ..... 44.00
Not exceeding 200 amp service ..... 55.00
Plus for each additional 100 amps or part thereof ..... 11.00
(New multifamily dwelling, each unit or apartment shall be treated as single-family dwelling and permit and service fees shall apply same for each unit or apartment)
Remodeling or additions to residential dwellings electrically (excluding service) ..... 27.50
Plus for every $1,000.00 of value or fractional part thereof ..... 11.00
Electrical permit for new commercial buildings (excluding service) ..... 55.00
Plus for each additional 100 amps ..... 10.00
New commercial service:
Not exceeding 100 amp service ..... 75.00
Not exceeding 200 amp service ..... 95.00
Plus for each additional 100 amps ..... 15.00
Remodeling or additions to existing commercial buildings electrically (excluding service) ..... 57.50
(2)
Reserved.
(3)
Pools:
Residence pools ..... 33.00
Commercial pools ..... 66.00
(4)
Commercial lighting:
Commercial light, switch and receptacles:
1 to 50 ..... 27.50
Over 50, each ..... 3.30
(5)
Signs:
Not exceeding 96 square feet, each ..... 55.00
Over 96 square feet, each ..... 110.00
Illumination of any sign in any manner, floodlights, border lights, etc., each ..... 55.00
1 transformer ..... 27.50
Additional transformer, each ..... 11.00
(6)
Motors:
Electric motors:
1/2 horsepower or less, operating at a potential of 500 volts or less, each ..... 11.00
Over 1/2 horsepower and not over 5 horsepower, operating at a potential of 500 volts or less, each ..... 27.50
Over 5 horsepower, operating at a potential of 550 volts or less, each ..... 44.00
High potential, operating at a potential of over 550 volts and less than 3,500 volts, regardless of horsepower, each ..... 66.00
(7)
Adding circuits: Adding circuits and/or outlets to existing buildings, such as dryers, washers, water heaters, pumps (excluding motors), lighting or appliances, or minor repairs, each ..... 27.50
(8)
Receptacles:
Receptacles outlets, each:
Capacity 0 to 100 amps ..... 0.55
(9)
Switches:
Switches, each:
Capacity up to 30 amperes, each ..... 0.55
Capacity exceeding 30 amperes, each ..... 5.50
(10)
Miscellaneous:
Repair and miscellaneous permit ..... 11.00
(11)
Additional inspections, reinspections: For additional inspections or reinspection, there will be a $35.00 charge in addition to the fees listed above.
(Ord. No. 2003-12, § 1, 11-20-03; Ord. No. 2017-18 , § 1, 7-5-17)