§ 8-27. Same—Amended.
The building code adopted in section 8-26 is hereby modified, altered, changed and amended by adopting a revised Chapter 1, Administration, which is attached hereto as Exhibit A and made a part hereof.
EXHIBIT A
SECTION 101 GENERAL101.1 Scope. The provisions of this chapter shall govern the administration and enforcement of the Florida Building Code.
101.2 Title. The provisions of the following chapters shall constitute and be known and be cited as the "Florida Building Code," hereinafter known as "this code."
101.3 Code Remedial. This code is hereby declared to be remedial and shall be construed to secure the beneficial interests and purposes thereof, which are public safety, health and general welfare through structural strength, stability, sanitation, adequate light and ventilation, and safety to life and property from fire and other hazards attributed to the built environment including alteration, repair, removal, demolition, use and occupancy of buildings, structures or premises, and by regulating the installation and maintenance of all electrical, gas, mechanical and plumbing systems, which may be referred to as service systems.
101.3.2 Quality control. Quality control of materials and workmanship is not within the purview of this code except as it relates to the purposes stated herein.
101.3.3 Permitting and inspection. The inspection or permitting of any building, system or plan by the jurisdiction under the requirements of this code shall not be construed in any court as a warranty of the physical condition of such building, system or plan or their adequacy. Neither the jurisdiction nor any employee thereof shall be liable in tort for damages for any defect or hazardous or illegal condition or inadequacy in such building, system or plan, nor for any failure of any component of such, which may occur subsequent to such inspection or permitting, unless the employee of jurisdiction is found to have acted in bad faith or with malicious purpose in a manner exhibiting wanton and willful disregard.
101.4 Applicability. Where, in any specific case, different sections of this code specify different materials, methods of construction or other requirements, the most restrictive shall govern. Where there is a conflict between a general requirement and a specific requirement, the specific requirement shall be applicable.
101.4.2.3.1 The building official shall apply the same standard to a moved residential building or structure as that applied to the remodeling of any comparable residential building or structure to determine whether the moved structure is substantially remodeled. The cost of the foundation on which the moved building or structure is placed shall not be included in the cost of remodeling for purposes of determining whether a moved building or structure has been substantially remodeled.
101.4.2.3.2 Unsafe Buildings shall be abated using the current edition of the International Property Maintenance Code promulgated by the International Code Council subject to all amendments, modifications or deletions hereinafter contained.
101.4.8. Appendices. To be enforced, the appendices included in the technical codes must be adopted by a local governmental jurisdiction for use in that jurisdiction.
SECTION 102
BUILDING INSPECTION DIVISION102.1 Establishment. There is hereby established a division to be called the Building Inspection division of the Planning and Community Development Department and the person in charge of inspections shall be known as the Building Official.
102.2 Employee qualifications.
102.2.1 Building Official Qualifications. The Building Official shall be licensed as a Building Code Administrator by the State of Florida. The Building Official shall be appointed or hired by the City Manager, or a designee.
102.2.3 Employee Qualifications. The Building Official, with the approval of the City Manager, or a designee, may appoint or hire such number of officers, inspectors, plans examiners, assistants and other employees as shall be authorized from time to time. A person shall not be appointed or hired as inspector or plans examiner unless that person meets the qualifications for licensure as an inspector or plans examiner, in the appropriate trade as established by the State of Florida.
102.3 Restrictions on employees. An officer or employee connected with the division shall not be financially interested in the furnishing of labor, material, or appliances for the construction, alteration, or maintenance of a building, structure, service, system or in the making of plans or of specifications thereof, within the jurisdiction of the division, unless he is the owner of such. This officer or employee shall not engage in any other work, which is inconsistent with his duties or conflict with the interest of the division.
102.4 Records. The Building Official shall keep, or cause to be kept, a record of the business of the division. The records of the division shall be open to public inspection.
102.5 Liability. Any officer or employee charged with the enforcement of this code, acting for the applicable governing authority in the discharge of his duties, shall not thereby render himself personally liable, and is hereby relieved from all personal liability, for any damage that may occur to persons or property as a result of any act required or permitted in the discharge of his duties. Any suit brought against any officer or employee or member because of such act performed by him in the enforcement of any provisions of this code shall be defended by the city attorney until the final termination of the proceedings, unless such person is found to have acted in bad faith or with malicious purpose or in a manner exhibiting wanton and willful disregard for the safety, health, and welfare of the public.
SECTION 103
POWERS AND DUTIES OF THE BUILDING OFFICIAL103.1 General. The building official is hereby authorized and directed to enforce the provisions of this code. The building official shall have the authority to render interpretations of this code and to adopt policies and procedures in order to clarify the application of its provisions. Such interpretations, policies and procedures shall be in compliance with the intent and purpose of this code and shall not have the effect of waiving requirements specifically provided for in this code.
103.2 Right of entry.
103.2.1 Whenever necessary to make an inspection to enforce any of the provisions of this code or whenever the building official has reasonable cause to believe that there exists in any building or upon any premises any condition or code violation which makes such building, structure, premises, electrical, gas, mechanical or plumbing systems unsafe, dangerous or hazardous, the building official may enter such building, structure or premises at all reasonable times to inspect the same or to perform any duty imposed upon the building official by this code. If such building or premises are occupied, he shall first present proper credentials and request entry. If such building, structure, or premises are unoccupied, he shall first make a reasonable effort to locate the owner or other persons having charge or control of such and request entry. If entry is refused, the building official shall have recourse to every remedy provided by law to secure entry.
103.2.2 When the building official shall have first obtained a proper inspection warrant or other remedy provided by law to secure entry, no owner or occupant or any other persons having charge, care or control of any building, structure, or premises shall fail or neglect, after proper request is made as herein provided, to promptly permit entry therein by the building official for the purpose of inspection and examination pursuant to this code.
103.3 Stop work orders. Upon notice from the building official, work on any building, structure, electrical, gas, mechanical or plumbing system that is being done contrary to the provisions of this code or in a dangerous or unsafe manner, shall immediately cease. Such notice shall be in writing and shall be given to the owner of the property, or to his agent, or to the person doing the work, and shall state the conditions under which work may be resumed. Where an emergency exists, the building official shall not be required to give a written notice prior to stopping the work.
103.4 Revocation of permits. The building official is authorized to suspend or revoke a permit issued under the provisions of this code wherever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any ordinance or regulation or any provisions of this code.
103.4.1 Misrepresentation of application. The building official may revoke a permit or approval, issued under the provisions of this code, in case there has been any false statement or misrepresentation as to the material fact in the application or plans on which the permit or approval was based.
103.4.2 Violation of code provisions. The building official may revoke a permit upon determination by the building official that the construction, erection, alteration, repair, moving, demolition, installation, or replacement of the building, structure, electrical, gas, mechanical or plumbing systems for which the permit was issued is in violation of, or not in conformity with, the provisions of this code.
103.5 Unsafe buildings or systems. All buildings, structures, electrical, gas, mechanical or plumbing systems which are unsafe, unsanitary, or do not provide adequate egress, or which constitute a fire hazard, or are otherwise dangerous to human life, or which in relation to existing use, constitute a hazard to safety or health, are considered unsafe buildings or service systems. All such unsafe buildings, structures or service systems are hereby declared illegal and shall be abated by repair and rehabilitation or by demolition in accordance with the provisions of the Standard Unsafe Building Abatement Code or other local ordinance.
103.6 Requirements not covered by code. Any requirements necessary for the strength, stability or proper operation of an existing or proposed building, structure, electrical, gas, mechanical or plumbing system, or for the public safety, health and general welfare, not specifically covered by this or the other technical codes, shall be determined by the building official.
103.8 Alternate materials and methods.
103.8.1 The provisions of the technical codes are not intended to prevent the use of any material or method of construction not specifically prescribed by them, provided any such alternate has been reviewed by the building official. The building official shall approve any such alternate, provided the building official finds that the alternate for the purpose intended is at least the equivalent of that prescribed in the technical codes in quality, strength, effectiveness, fire resistance, durability and safety. When alternate life safety systems are designed, the "SFPE Engineering Guide to Performance-Based Fire Protection Analysis and Design of Buildings," or other methods approved by the building official may be used. The building official shall require that sufficient evidence or proof be submitted to substantiate any claim made regarding the alternate.
103.8.2 Accessibility. Alternate designs and technologies for providing access to and usability of a facility for persons with disabilities shall be in accordance with Section 11-2.2 of the Florida Building Code.
SECTION 104
PERMITS104.4.5 Special foundation permit. When application for permit to erect or enlarge a building has been filed and pending issuance of such permit, the building official may, at his discretion, issue a special permit for the foundation only. The holder of such a special permit is now proceeding at their own risk and without assurance that a permit for the remainder of the work will be granted nor that corrections will not be required in order to meet provisions of the technical codes.
104.4.6 Public right of way. A permit shall not be given by the building official for the construction of any building, or for the alteration of any building where said building is to be changed and such change will affect the exterior walls, bays, balconies, or other appendages or projections fronting on any street, alley or public lane, or for the placing on any lot or premises of any building or structure removed from another lot or premises, unless the applicant has made application for right of way permits from the authority having jurisdiction over the street, alley or public lane.
104.5.1 Permit intent. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter or set aside any of the provisions of the technical codes, nor shall issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans, construction, or violations of this code. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 6 months after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 6 months after the time the work is commenced. Failure to obtain an approved inspection within 180 days of the previous approved inspection shall constitute suspension or abandonment. One or more extensions of time, for periods not more than 180 days each, may be allowed by the building official for the permit, provided the extension is requested in writing and justifiable cause is demonstrated prior to the expiration date. The building official shall record the extension of time granted.
104.5.1.1 If work has commenced and the permit is revoked, becomes null and void, or expires because of lack of progress or abandonment, a new permit covering the proposed construction shall be obtained before proceeding with the work.
104.5.1.2 If a new permit is not obtained within 180 days from the date the initial permit became null and void, the building official is authorized to require that any work which has been commenced or completed be removed from the building site. Alternately, a new permit may be issued on application, providing the work in place and required to complete the structure meets all applicable regulations in effect at the time the initial permit became null and void and any regulations which may have become effective between the date of expiration and the date of issuance of the new permit.
104.5.1.3 Work shall be considered to be in active progress when the permit has received an approved inspection within 180 days. This provision shall not be applicable in case of civil commotion or strike or when the building work is halted due directly to judicial injunction, order or similar process.
104.5.1.4 The fee for renewal, re-issuance and extension of a permit shall be set forth by the administrative authority.
104.5.1.5 Permits issued for the demolition of a structure shall expire sixty (60) days from the date of issuance. For a justifiable cause, one (1) extension of time for a period not exceeding thirty (30) days may be allowed. Such request shall be in writing to the building official.
104.5.2 Permit issued on basis of an affidavit. Whenever a permit is issued in reliance upon an affidavit or whenever the work to be covered by a permit involves installation under conditions which, in the opinion of the building official, are hazardous or complex, the building official shall require that the architect or engineer who signed the affidavit or prepared the drawings or computations shall supervise such work. In addition, they shall be responsible for conformity to the permit, provide copies of inspection reports as inspections are performed, and upon completion make and file with the building official written affidavit that the work has been done in conformity to the reviewed plans and with the structural provisions of the technical codes. In the event such architect or engineer is not available, the owner shall employ in his stead a competent person or agency whose qualifications are reviewed by the building official. The building official shall ensure that any person conducting plans review is qualified as a plans examiner under F.S. Ch. 468, pt. XII and that any person conducting inspections is qualified as a building inspector under F.S. Ch. 468, pt. III.
104.5.3 Plans. When the building official issues a permit, the building official shall endorse, in writing or by stamp both sets of reviewed plans "Reviewed for Code Compliance." One set of reviewed drawings shall be retained by the building official and the other set shall be returned to the applicant. The permit drawings shall be kept at the site of work and shall be open to inspection by the building official or his authorized representative.
104.5.4 Work starting before permit issuance. Upon approval of the building official, the scope of work delineated in the building permit application and plans may be started prior to the final approval and issuance of the permit provided any work completed is entirely at risk of the permit applicant and the work does not proceed past the first required inspection.
104.6 Fees.
104.6.1 Prescribed fees. A permit shall not be issued until fees authorized under F.S. § 553.80 have been paid. Nor shall an amendment to a permit be released until the additional fee, if any, due to an increase in the estimated cost of the building, structure, electrical, plumbing, mechanical or gas systems, has been paid.
104.6.2 Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the building official's approval or the necessary permits shall be subject to a penalty of 100 percent of the usual permit fee in addition to the required permit fees or as provided by local ordinance. This provision shall not apply to emergency work when delay would clearly have placed life or property in imminent danger. But in all such cases the required permit(s) must be obtained within three (3) business days and any unreasonable delay in obtaining those permit(s) shall result in the charge of a double fee. The payment of a double fee shall not preclude or be deemed a substitute for prosecution for commencing work without first obtaining a permit. The building official may grant extensions of time or waive fees when justifiable cause has been demonstrated in writing.
104.6.3 Accounting. The building official shall keep a permanent and accurate accounting of all permit fees and other monies collected, the names of all persons upon whose account the same was paid, along with the date and amount thereof.
104.6.4 Schedule of Permit Fees. On all buildings, structures, electrical, plumbing, mechanical and gas systems or alterations requiring a permit, a fee for each permit shall be paid as required at the time of filing application, in accordance with the schedule as established by the applicable governing authority.
104.6.5 Types of Fees Enumerated. Fees may be charged for but not limited to the following:
•
Permits;
•
Plans examination;
•
Certificates of competency (including fees for applications, examinations, renewal, late renewal, and reciprocity);
•
Re-inspections;
•
Administrative fees;
•
Variance requests;
•
Violations; and
•
Other fees as established by local ordinance.
104.6.6 Building permit valuations. If, in the opinion of the building official, the valuation of building, alteration, structure, electrical, gas, mechanical or plumbing systems appears to be underestimated on the application, permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Permit valuations shall include total cost, such as electrical, gas, mechanical, plumbing equipment and other systems, including materials and labor. The permit valuation may be calculated using the latest Building Valuation Data published by the International Code Council (ICC) or other applicable model code organization, at the option of the building official.
SECTION 105
INSPECTIONS105.1 Existing building inspections. Before issuing a permit, the building official may examine or cause to be examined any building, electrical, gas, mechanical, or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. He shall inspect all buildings, structures, electrical, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of the technical codes.
105.2 Manufacturers and fabricators. When deemed necessary by the building official, he shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of all violations of the technical codes.
105.3 Inspection service. The building official may make, or cause to be made, the inspections required by Section 105. He or she may accept reports of building inspection division inspectors, independent inspectors or of recognized inspection services, provided that after investigation he/she is satisfied as to their licensure, Qualifications and reliability. A certificate required by any provision of this code shall not be based on such reports unless the same are recorded by the building code inspector or the architect or engineer performing building code inspections in a manner specified by the building official. The building official shall ensure that all persons making such inspections shall be certified in accordance to F.S. Ch. 468.
105.4 Inspections prior to issuance of Certificate of Occupancy or Completion. The building official shall inspect or cause to be inspected, at various intervals, all construction or work for which a permit is required, and a final inspection shall be made of every building, structure, electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the Certificate of Occupancy or Certificate of Completion. In performing inspections, the building official shall give first priority to inspections of the construction, addition, or renovation to, any facilities owned or controlled by a state university, state community college or public school district.
105.5 Posting of permit. Work requiring a permit shall not commence until the permit holder or his agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position as to permit the building official or representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the Certificate of Occupancy or Completion is issued by the building official.
105.7 Written release. Work shall not be done on any part of a building, structure, electrical, gas, mechanical or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the building official. Such written release shall be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing three inspections.
105.8 Reinforcing steel and structural frames. Reinforcing steel or structural framework of any part of any building or structure shall not be covered or concealed without first obtaining a release from the building official.
105.9 Plaster fire protection. In all buildings where plaster is used for fire protection purposes, the permit holder or his agent shall notify the building official after all lathing and backing is in place. Plaster shall not be covered or concealed from view without first obtaining a release from the building official.
105.10 Fire resistant joints and penetrations. The protection of joints and penetrations in required fire resistant construction assemblies shall not be covered or concealed from view without first obtaining a release from the building official.
105.12 Shoring. For threshold buildings, shoring and associated formwork or falsework shall be designed and inspected by a Florida Licensed Professional Engineer, employed by the permit holder or subcontractor, prior to any required mandatory inspections by the Threshold Building inspector.
105.13 Threshold building.
105.13.1 The enforcing agency shall require a special inspector to perform structural inspections on a threshold building pursuant to a structural inspection plan prepared by the engineer or architect of record. The structural inspection plan must be submitted to the enforcing agency prior to the issuance of a building permit for the construction of a threshold building. The purpose of the structural inspection plan is to provide specific inspection procedures and schedules so that the building can be adequately inspected for compliance with the permitted documents.
105.13.2 The special inspector shall inspect the shoring and reshoring for conformance to the shoring and reshoring plans submitted to the enforcing agency. A fee simple title owner of a building which does not meet the minimum size, height, occupancy, occupancy classification or number of stories criteria which would result in classification as a threshold building under F.S. § 553.81(8), may designate such building as a threshold building, subject to more than the minimum number of inspections required by the Florida Building Code, Building.
105.13.3 The fee owner of a threshold building shall select and pay all costs of employing a special inspector, but the special inspector shall be responsible to the enforcement agency. The inspector shall be a person certified, licensed, or registered under F.S. Ch. 481 as an engineer or under F.S. Ch. 481 as an architect.
105.13.4 Each enforcement agency shall require that, on every threshold building:
105.13.4.1 The special inspector, upon completion of the building and prior to the issuance of a Certificate of Occupancy, file a signed and sealed statement with the enforcement agency in substantially the following form: "To the best of my knowledge and belief, the above-described construction of all structural load bearing components complies with the permitted documents, and the shoring and reshoring conforms to the shoring and reshoring plans submitted to the enforcement agency."
105.13.4.2 Any proposal to install an alternate structural product or system to which building codes apply be submitted to the enforcement agency for review for compliance with the codes and made part of the enforcement agency's recorded set of permit documents.
105.13.4.3 All shoring and reshoring procedures, plans and details be submitted to the enforcement agency for record keeping. Each shoring and reshoring installation shall be supervised, inspected and certified to be in compliance with the shoring documents by the contractor.
105.13.4.4 All plans for the building which are required to be signed and sealed by the architect or engineer of record contain a statement that, to the best of the architect's or engineer's knowledge, the plans and specifications comply with the applicable minimum building codes and the applicable fire-safety standards as determined by the local authority in accordance with this section and F.S. Ch. 633.
105.13.5 No enforcing agency may issue a building permit for construction of any threshold building except to a licensed general contractor, as defined in F.S. § 489.105(3)(a), or to a licensed building contractor, as defined in F.S. § 489.105(3)(b), within the scope of his or her license.
105.13.6 The building inspection division may allow a special inspector to conduct the minimum structural inspection of threshold buildings required by this code, F.S. § 553.83, without duplicative inspection by the building inspection division. The building official is responsible for ensuring that any person conducting inspections is qualified as a building inspector under F.S. Ch. 468, pt. XII, or certified as a special inspector under F.S. Ch. 481. Inspections of threshold buildings required by F.S. § 553.89(5), are in addition to the minimum inspections required by this code.
SECTION 106
CERTIFICATES106.1 Certificate of occupancy.
106.1.1 Building Occupancy. A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the building official has issued a Certificate of Occupancy. Said certificate shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the technical codes and other applicable laws and ordinances and released by the building official.
106.1.2 Issuing Certificate of Occupancy. Upon completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the technical codes, reviewed plans and specifications, and after the final inspection, and after verification that all septic system permits have received an approved final inspection where applicable, the building official shall issue a Certificate of Occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor in accordance with the provisions of this code.
106.1.3 Temporary/Partial occupancy. A temporary/partial Certificate of Occupancy may be issued for a portion or portions of a building, which may safely be occupied prior to final completion of the building.
106.2 Certificate of completion. A certificate of completion is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system. This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a Certificate of Occupancy.
106.3 Service utilities.
106.3.1 Connection of service utilities. No person shall make connections from a utility source of energy, fuel or power to any building or system which is regulated by the technical codes for which a permit is required, until released by the building official and a Certificate of Occupancy or Completion is issued.
106.3.2 Temporary connection. The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel or power for the purpose of testing building service systems or for use under a temporary Certificate of Occupancy.
106.3.3 Authority to disconnect service utilities. The building official shall have the authority to authorize disconnection of utility service to the building, structure or system regulated by the technical codes in case of emergency where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility, and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system shall be notified in writing, as soon as practical thereafter.
106.4 Posting floor loads.
106.4.1 Occupancy. An existing or new building shall not be occupied for any purpose, which will cause the floors thereof to be loaded beyond their safe capacity.
106.4.2 Storage and Factory-Industrial Occupancies. It shall be the responsibility of the owner, agent, proprietor or occupant of Group S and Group F occupancies, or any occupancy where excessive floor loading is likely to occur, to employ a competent architect or engineer in computing the safe load capacity. All such computations shall be accompanied by an affidavit from the architect or engineer stating the safe allowable floor load on each floor in pounds per square foot uniformly distributed. The computations and affidavit shall be filed as a permanent record of the building inspection division.
106.4.3 Signs required. In every building or part of a building used for storage, industrial or hazardous purposes, the safe floor loads, as reviewed by the building official on the plan, shall be marked on plates of approved design which shall be supplied and securely affixed by the owner of the building in a conspicuous place in each story to which they relate. Such plates shall not be removed or defaced, and if lost, removed or defaced, shall be replaced by the owner of the building.
SECTION 107
TESTS107.1 For products not covered under the statewide product evaluation and approval system, the building official may require tests or test reports as proof of compliance. Required tests are to be made at the expense of the owner, or his agent, by an approved testing laboratory or other approved agency.
SECTION 108
SEVERABILITY108.1 If any section, subsection, sentence, clause or phrase of this code is for any reason held to be unconstitutional, such decision shall not affect the validity of the remaining portions of this code.
SECTION 109
VIOLATIONS AND PENALTIES109.1 Any person, firm, corporation or agent who shall violate a provision of this code, or fail to comply therewith, or with any of the requirements thereof, or who shall erect, construct, alter, install, demolish or move any structure, electrical, gas, mechanical or plumbing system, or has erected, constructed, altered, repaired, moved or demolished a building, structure, electrical, gas, mechanical or plumbing system, in violation of a detailed statement or drawing submitted and permitted there under, shall be guilty of a misdemeanor of the second degree. Each such person shall be considered guilty of a separate offense for each and every day or portion thereof during which any violation of any of the provisions of this code is committed or continued. Upon conviction of any such violation such person shall be punished within the limits as provided by law and local ordinance.
(Ord. No. 2003-12, § 1, 11-20-03; Ord. No. 2006-17, § 1, 9-25-06; Ord. No. 2017-18 , § 1, 7-5-17)